Project Overview:
Description:
Full project management, Super-lift, logistical planning and associated accessories for
elevator system / tanks and infrastructure from China main port to Port Kembla terminal.
Cargo Details:
- 397MT / 16,000CBM single super lift
- 21 packages totaling 123MT / 1400CBM
- 150+ special size/general size container loads (OT/OTHQ/FR and standard containers)
SEAWAY’s Role:
- Concept to completion involvement
- Lift plans and design of super-lift
- Multiple offshore site inspections and check measures
- Charter vessel arrangements
- Design, supply, survey & ensure certification for special support stand for boom in transit.
- Liaison with harbor master for concept approvals
- Super-lift and placement of cargo on rails/wharf
Scope of Works:
- Detailed lift plans and design
- Chartering appropriate vessels
- Loading and unloading logistics
- SWMS and planning for restricted vessel access China + Australia during Covid period
Highlights:
- Successfully lifting a 397MT / 16,000CBM single super-lift structure with existing infrastructure in situ.
Challenges:
- Working with existing infrastructure limitations of a single 16,000CBM lift
- Covid 19 planning throughout concept, construction, planning, shipping and travel during this time.
- Ensuring placement on reinforced rails/wharf
Innovations:
- Design, build-up and test parameters for shipping of stands/support of boom in transit.
Unique Safety Considerations:
- Approval from harbor master for all drawings and plans for line of sight
- Lashing study and supports to ensure force measures covered in all aspects.
Unique Environment Considerations:
- Direct access to wharf
- Adapting to existing infrastructure limitations
Let's talk
We’re here to help. With an extensive network of local and global partners our professional teams will find the best solution for you.
Get in touch